top of page

OUR PROJECTS

SPORT CENTER

sport complex tenggarong.PNG

SPORT COMPLEX TENGGARONG

Location

Year

Client

 

 

Professional Services

Geotechnical challenge and accomplishment:

:

:

:

:

:

Kutai Kertanegara, East Kalimantan

2006

Local Goverment Kutai Tenggarong

PT. Disthi Kencana Putri

Geotechnical consultancy

Design of foundation

Review of soil improvement

Soil investigation with CPTu

The complex is located next to Mahakam River where the soft soils are very deep. Prior to building the structure ground movement was carried out by preloading and vertical drain. PT. GEC task is to design ground improvement and decide whether the degree of consolidation achieved PT. GEC developed the use of CPTu test results to obtain the degree of consolidation beside the settlement plate monitor.

gedebage.jpg

STADION GELORA BANDUNG LAUTAN API

Location

Year

Client

Development

 

 

Professional Services

:

:

:

:

 

:

Bandung, West Java

2010 / 2011 / 2016

PT. Penta Rekayasa

60.000 m2 building area

40.000 spectators

Geotechnical consultancy

Review basic design of foundation and soil improvement

Inklinometer monitoring

Soil investigation with CPTu and DMT

papua bangkit.jpg

STADION PAPUA BANGKIT

Location

Year

Client

Development

 

 

Professional Services

:

:

:

:

:

Sentani, Papua

2017

PT. Penta Rekayasa

72.000 m2 building area

40.000 spectators

Geotechnical consultancy

Review design of foundation

Ground anchor design for foundation  reinforcement against tensile forces

manahan.jpg

STADION MANAHAN SOLO

Location

Year

Client

Development

 

Foundation

 

Professional Services

:

:

:

:

 

:

:

Solo, Central Java

2018

PT. Penta Rekayasa

34.960 m2 building area

20.000 spectators

 

Driven pile & bored pile

Geotechnical consultancy

Design of additional foundation 

JIS.jpg

JAKARTA INTERNATIONAL STADIUM

Location

Year

Client

 

Development

 

 

 

Foundation

 

Professional Services

:

:

:

:

 

 

:

:

North Jakarta

2019

PT. Penta Rekayasa

191.198 m2 site area

424.221 m2 building area

80.000 spectators

Driven Pile

Geotechnical consultation

Soil investigation with PMT and CPTu

Design of foundation

Site Specific Response Analysis 

Loading test Evaluation

stadion banten.PNG

STADION BANTEN

Location

Year

Client

Development

 

Foundation

Professional Services

:

:

:

:

 

:

:

Serang, Banten

2020

PT. Penta Rekayasa

220 x 300 m2 stadium

5 stories and 1 story for media platform

Bored pile

 

Geotechnical consultancy

Design of foundation and shoring system

Indoor-Multifunction-Stadion-di-kawasan-GBK-Jakarta.jpg

INDOOR MULTIFUNCTION STADIUM - GBK

Location

Year

Client

Development

Foundation

Professional Services

:

:

:

:

:

:

Central Jakarta

2021

PT. Penta Rekayasa

Stadium with 16.000 spectators

Driven Pile & Bored Pile

 

Geotechnical consultancy    

Design for Pile Foundation System    

Analysis of Foundation Settlement & Building Distortion

bottom of page