OUR PROJECTS

LAND DEVELOPMENT

summarecon-bandung.jpg

SUMMARECON BANDUNG

Location

Year

Client

Development

Professional Services

Challenge and accomplishment

:

:

:

:

 

:

:

Gedebage, Bandung, West Java

2014

PT. Mahkota Permata Perdana

 

300 Ha development area

 

Development Area :    

Geotechnical consultancy

Soil Investigation with CPTu

Basic design of foundation and soil improvement

Mall, Hotel, Parking Bulding :    

Geotechnical consultancy

Soil Investigation with CPTu and DMT

Design for foundation

Evaluation of soil improvement

Frontage Road :

Geotechnical consultancy

Soil Investigation with CPTu

Design of foundation and settlement evaluation

 

Development in the south Bandung area requires careful study due to the fact that the soil condition is soft lacustrine (lake deposit) as deep as 20-30 meters. Hence ground improvement with PVD and preloading or vacuum have been proposed. GEC provide services to overcome the soft soil condition and help design and monitor of the soft ground performance. 

apl bubat.png

PODOMORO PARK BANDUNG

Location

Year

Client

Development

Professional Services

Challenge and accomplishment

:

:

:

:

 

:

:

Buah Batu, Bandung, West Java

2017

Agung Podomoro Land

300 Ha development area

Geotechnical consultancy

Soil Investigation with CPTu

Basic design of foundation

Design of soil improvement

Supervision of geotechnical works

The site located in Bandung Basin with her well known lacustrine (lake deposit). However this site has varying soil stratification where sand lenses or lahat formation inter bedded, causing problems for ground improvement and pilings. GEC provide the best solution to manage the development in geotechnical aspect including the beautiful long pond in the middle of masterpiece.

pramestha.jpg

PRAMESTHA MOUNTAIN CITY

Location

Year

Client

Development

Professional Services

:

:

:

:

 

:

Bandung, West Java

2019

PT. Lembang Permata Recreation Estate

4.8 Ha development area

Geotechnical consultancy

Confirmatory soil investigation

Basic design of foundation and slope stability

citraland makassar.jpg

CITRALAND CENTERPOINT MAKASSAR

Location

Year

Client

Development

Professional Services

Challenge and accomplishment

:

:

:

:

 

:

:

Makassar, South Sulawesi

2019

KSO Ciputra - Yasmin

157 Ha development area

Geotechnical consultancy

Soil Investigation with CPTu

Design of foundation

Evaluation of soil improvement

Pile Instrumented with Fiber Optic

Supervision of geotechnical works

The reclamation work has been successfully done with substantial thickness of sand fill compacted to achieve requires density. The challenges include assessment of the preparation of the land for building and infrastructure. Special foundation of short pile and cap is introduced as innovation.

pik 2.png

PIK 2 DISTRICT 17A, 17B, 25, 26

Location

Year

Client

Development

Professional Services

:

:

:

:

 

:

Kosambi, Tangerang, Banten

2020

PT. Kukuh Mandiri Lestari

300 Ha development area

Geotechnical consultancy

Soil Investigation with CPTu

Review design of foundation

Evaluation of soil improvement

tenjo master plan.jpg

KOTA PODOMORO TENJO
CLUSTER 1 & 2 PHASE 1 & 2B

Location

Year

Client

Development

Professional Services

:

:

:

:

 

:

Tenjo, Kab. Bogor, West Java

2020

PT. Kota Podomoro Tenjo Sejahtera

300 Ha development area

Geotechnical Design Criteria (Slope Stability, Shallow Foundation)

Geotechnical response (feasibility of embankment material, groundwater management, method of backfilling, impact of embankment on subgrade settlement, stability of embankment and excavation, building foundations, additional soil investigation)

 

Supervision on Geotechnical Works

KLENDER.jpg

BUKIT PODOMORO JAKARTA

Location

Year

Client

Development

Professional Services

:

:

:

:

 

:

Klender, East Jakarta

2021

PT. Graha Cipta Kharisma

4.2 Ha development area

Geotechnical Problem Analysis

Geotechnical Design Criteria (Land Development, DPT, Foundation)

Land Development Design and Analysis

Determination of the specification of the material of the stockpile

DPT Design Review

Pile Foundation System Design and Analysis