
TAMAN ISMAIL MARZUKI PHASE 2
Location
​
Year
​
Client
​
Development
​
​
​
Foundation
​
Retaining Wall
​
Professional Services
​
:
​
:
​
:
​
:
​
​
:
​
:​
​
:
Central Jakarta
​
2020
​
PT. Penta Rekayasa
Gedung Graha Bakti Budaya (5 stories + 2 stories basement)
Basement connecting road (1 story)
​
Bored Pile
​
Secant Pile with strut
​
Geotechnical consultancy
Design of foundation and shoring system

TAMAN ISMAIL MARZUKI PHASE 1
Location
​
Year
​
Client
​
Development
​
​
​
Foundation
​
Retaining Wall
​
Professional Services
​
:
​
:
​
:
​
:
​
​
:
​
:​
​
:
Central Jakarta
​
2019
​
PT. Penta Rekayasa
Hotel & Library (14 stories + 2 stories basement)
Parking Building (1 story + 1 story basement)
​
Bored Pile and Driven Pile
​
Secant Pile with strut
​
Geotechnical consultancy
Design of foundation and shoring system
Pile monitoring with fiber optic

PAKUWON RESIDENCES BEKASI
Location
​
Year
​
Client
​
Development
​
​
​
Foundation
​
Retaining Wall
​
Professional Services
​
:
​
:
​
:
​
:
​
​
:
​
:​
​
:
Bekasi, West Java
​
2018
​
PT. Grama Pramesi Siddhi (Pakuwon Jati Group)
5 Apartment & Hotel tower (+/-41 stories)
Mall / Podium (16 stories)
Basement (3 stories)
​
Bored Pile and Driven Pile
​
Secant Pile
Geotechnical consultancy
Design of foundation and shoring system
Inclinometer monitoring
Supervision for geotechnical works
Pile monitoring with fiber optic

THE NOVE - NORTH GOLF RESIDENTIAL
Location
​
Year
​
Client
​
Development
​
​
Foundation
​
Professional Services
​
:
​
:
​
:
​
:
​
​
:
​
:​
Nuvasa Bay, Nongsa, Batam
​
2018
​
AFP Dwilestari
3 Apartment & Hotel tower (9 stories)
Residential Area (2-3 stories in 5 Ha area)
​
Shallow foundation and driven pile
Geotechnical consultancy
Soil investigation with drilling and CPT
Topographic Survey with Geolistrik
Design of foundation
Inclinometer monitoring
​

ADR PIK
Location
​
Year
​
Client
​
Owner
​
Development
​
​
Foundation
​
Retaining Wall
​
Professional Services
​
:
​
:
​
:
​
:
​
:
​
​
:
​
:​
​
:
North Jakarta
​
2017
​
PT. Haerte Widya Konsultan
PT. Griya Inti Perkasa
1 Office tower (26 stories)
2 Apartment towers (30 stories)
Basement (3 stories)
​
Bored pile
​
D-wall with ground anchor
Geotechnical consultancy
Soil investigation with CPTu
Design of foundation and shoring system
Seismic Hazard Studies and Site Specific Response Analysis
Pile monitoring with Fiber Optic
​

EAST COAST CENTER PHASE 2 & 3
Location
​
Year
​
Client
​
Development
​
​
Foundation
​
Retaining Wall
​
Professional Services
​
:
​
:
​
:
​
:
​
​
:
​
:
​
:​
Surabaya, East Java
​
2016
​
PT. Pakuwon Jati
​
3 Condominium towers (31 stories)
Mall - Podium (10 stories)
​
Driven pile and bored pile
​
Secant Pile
Geotechnical consultancy
Soil investigation with PMT and CPTu
Design of foundation & slope stability analysis
Geotechnical Monitoring with inclinometer, ekstensometer, piezometer VW and standpipe
Supervision for geotechnical works
Pile monitoring with fiber optic

SUPERMALL PAKUWON INDAH PHASE 4
Location
​
Year
​
Client
​
Development
​
Foundation
​
Professional Services
​
​
​
​
Challenge and accomplishment
:
​
:
​
:
​
:
​
​
:
​
:​
​
​
​
​
​
:
West Surabaya, East Java
​
2015
​
PT. Pakuwon Jati Tbk
3 Condominium towers (39 stories)
Mall (3 stories)
​
Driven and bored pile (1939 piles)
Geotechnical consultancy
Confirmatory soil investigation
Optimization of foundation design
Design of retaining system
Supervision of excavation and pilings
​
The location of the high rise building close to existing buildings has caused risk on damaging the neighbor, hence combination of driven piles and bored piles were selected and GEC work out the different pile stiffness and different behavior of the piles to be carried out.

MENARA JAKARTA
Location
​
Year
​
Client
​
Owner
Development
​
Foundation
​
Professional Services
​
:
​
:
​
:
:
:
​
​
:
​
:​
​
​
North Jakarta
​
2014
​
PT. Penta Rekayasa
​
Agung Sedayu Group
5 Apartment tower (42 stories)
1 Office tower (45 stories)
​
Bored Pile
​
Geotechnical consultancy
Foundation design
Settlement analysis

GOLD COAST - PIK 2
Location
​
Year
​
Client
​
Development
​
Foundation
​
Professional Services
​
:
​
:
​
:
:
​
​
:
​
:​
​
​
North Jakarta
​
2013
​
PT. Multi Artha Pratama
(Agung Sedayu Group)
​
2 Office towers (32 stories)
6 Apartment towers (32 stories)
​
Driven Pile
​
Geotechnical advisory
Piling supervision

TUNJUNGAN PLAZA 6
Location
​
Year
​
Client
Development
​
​
​
Foundation
​
Retaining Wall
​
Professional Services
​
:
​
:
​
:
​
:
​
​
​
​
:​
​
:
​
:
Surabaya, East Java
​
2013
​
PT. Pakuwon Jati
1 Apartment tower (52 stories)
1 Office tower (40 stories)
Mall
Basement
​
Bored pile
​
Sheet Pile
Geotechnical consultancy
Design of foundation and shoring system

DISTRICT 8
Location
​
Year
​
Client
​
Development
​
​
Foundation
​
Professional Services
​
:
​
:
​
:
​
:
​
​
:
​
:​
​
South Jakarta
​
2012
​
PT. Bintang Sedayu Makmur
(Agung Sedayu Group)
5 Apartment tower (42 stories)
1 Office tower (55 stories)
​
Raft Foundation
​
Geotechnical advisory
Confirmatory soil investigation
Geotechnical monitoring for settlement induced by raft foundation
​

SUPERMALL PAKUWON INDAH PHASE 2 & 3
Location
​
Year
​
Client
​
Development
​
​
Foundation
​
Retaining Wall
​
Professional Services
​
​
​
​
​
Challenge and accomplishment
:
​
:
​
:
​
:
​
​
​
:
​
:​
​
:
​
​
​
​
​
​
:
West Surabaya, East Java
​
2011
​
PT. Pakuwon Permai (Pakuwon Jati Group)
3 Condominium towers (45 stories)
1 Hotel tower (45 stories)
Mall (3 stories)
​
Driven and bored pile (2344 piles)
​
Bored pile, soil nailing, shotcrete
Geotechnical consultancy
Confirmatory soil investigation
Optimization of foundation design
Design of retaining system
Supervision of excavation and pilings Inclinometer monitoring
​
Piling in expansive soils has several challenges including penetrability and heave. GEC helped to manage by heave investigating prior to piling and redriving to avoid substantial heave. Also pile capacity has been optimized.

TUNJUNGAN PLAZA 5
Location
​
Year
​
Client
Development
​
​
​
​
Foundation
​
Retaining Wall
​
Professional Services
​
:
​
:
​
:
​
:
​
​
​
:​
​
:
​
:
Surabaya, East Java
​
2010
​
PT. Pakuwon Jati
1 Condominium tower (52 stories)
1 Office tower (27 stories)
1 Hotel
Mall
Basement (2 stories)
​
Driven piles
​
D-wall with strutting and secant pile
Geotechnical consultancy
Soil investigation with CPTu
Design of foundation and shoring system
Inclinometer monitoring
Supervision for geotechnical works

DELI GRAND CITY MEDAN
Location
​
Year
​
Client
​
Owner
Development
​
​
​
Foundation
​
Retaining Wall
​
Professional Services
​
:
​
:
​
:
:
:
​
​
:​
​
:
​
:
Medan, North Sumatera
​
2008 / 2013
​
PT. Sinar Menara Deli
PT. Haerte Widya Konsultan Engineers
Agung Podomoro Group
3 Apartment towers (23 stories)
1 Office towers (35 stories)
Hotel (15 stories)
Mall (5 stories)
​
Driven piles
​
D-wall
Geotechnical consultancy
Soil investigation with CPTu
Design of foundation and shoring system
​

CENTRAL PARK
Location
​
Year
​
Client
​
Owner
​
Development
​
​
Foundation
​
Professional Services
​
​
​
​
Challenge and accomplishment
​
:
​
:
​
:
​
:
:
​
​
​
:​
​
:
​
​
​
​
​
:
West Jakarta
​
2007
​
PT. Total Bangun Persada
Agung Podomoro Group
​
3 Apartment towers (48 stories)
1 Office towers (41 stories)
Hotel (27 stories)
Mall (15 stories)
​
Driven piles (6000 piles)
Geotechnical consultancy
Confirmatory soil investigation
Optimization of foundation design
Design of retaining systems
Supervision of excavation and pilings
​
Difficult subsoil condition (soft soils) with varying depth of bearing layer causing piling with different depths. GEC helped the contractor to supervise and optimize the piling and save pile waste by accurately determining the zoning of pile length due to soft soil layer, instead of pilling in the beginning of the project, excavation was conducted first prior to pile mass production.

GANDARIA CITY
Location
​
Year
​
Client
​
Owner
​
Development
​
​
Foundation
​
Professional Services
​
​
Challenge and accomplishment
:
​
:
​
:
​
:
​
:
​
​
:​
​
:
​
​
​
:
South Jakarta
​
2006
​
PT. Artisan Wahyu
PT. Pakuwon Jati
Apartment (43 stories)
Hotel (18 stories)
Office tower (33 stories)
Podium (4 stories)
Basement (3 stories)
​
Bored Pile (Pile Raft System)
Geotechnical consultancy
Foundation and shoring redesign
Supervision on substructure work
​
Soil condition at cut off level is cemented sands. PT. GEC achievement is the optimization of pile length from originally 34 m into 25 m with allowable capacity 800 tons and substantial saving excavation method. The cemented sands achieve friction as high as 350 - 400 kPa and the design consider raft capacity to carry the load.