top of page

OUR PROJECTS

HOTEL

PADMA BDG.png

PADMA HOTEL BANDUNG

Location

​

Year

​

Client

​

​

Development

​

 

 

 

Foundation

 

Retaining Wall

 

Professional Services

​

​

​

Challenge and accomplishment

​

:

​

:

​

:

​

​

:

 

 

 

 

:​

​

:

​

:

​

​

​

​

:

Bandung, West Java​

​

2006

​

PT. Trigana Putra Mandiri

PT. Jaya Kusuma Sarana

 

Hotel (6 stories)

Wing Hotel (2 stories)

Entertainment Room

Park House

​

Bored Pile

​

Soldier Pile, Soil Nailing, and Shotcrete

 

Geotechnical consultancy

Soil investigation

Design of foundation and shoring system   Supervision of geotechnical works

​

Difficult terrain condition where buildings have to be designed safely on steep slopes. Bored piles were selected for foundation system and slope protection has been successfully done.

PADMA UBUD.png

PADMA RESORT UBUD

Location

​

Year

​

Client

​

Development

​

​

 

Foundation

 

Retaining Wall

 

Professional Services

​

​

​

Challenge and accomplishment

:

​

:

​

:

​

:

 

 

​

:​

​

:

​

:

​

​

​

​

:

Gianyar, Bali​

​

2011

​

PT. Puri Zuqni

 

20.000m2 development area

Guest room building blocks (6 stories)

Resort Facilities

​

Shallow Foundation and Driven Pile

​

Soldier Pile and Soil Nailing

 

Geotechnical consultancy

Soil investigation

Design of foundation and shoring system

Inclinometer monitoring

​

Buildings and pools on slopes are typical challenges in Ubud area. GEC investigated and ensure the safety by sufficient investigation and monitoring slopes with inclinometers.

HOTEL PESONA ALAM CISARUA.jpg

HOTEL PESONA ALAM CISARUA

Location

​

Year

​

Client

​

Development

 

Foundation

 

Professional Services

​

:

​

:

​

:

​

:

​

:​

​

:

Bogor, West Java​

​

2011

​

PT. Kusuma Anugrah Damai Sejahtera

 

5 blocks hotel (2-5 stories)

​

Bored Pile

 

Geotechnical consultancy

Design of foundation 

Slope stability analysis

tune hotel arjuna surabaya.jpg

TUNE HOTEL ARJUNA SURABAYA

Location

​

Year

​

Client

​

Development

​

 

Foundation

 

Retaining Wall

 

Professional Services

​

:

​

:

​

:

​

:

 

​

:​

​

:

​

:

Surabaya, East Java​

​

2011

​

PT. Planet Merah Lima

​

1 hotel tower (7 stories)

Small Basement

​

Driven Pile (Push in / Jack in Method)

​

Spunpile

 

Geotechnical consultancy

Soil investigation

Design of foundation and shoring system

tune-hotel-makassar.jpg

TUNE HOTEL MAKASSAR

Location

​

Year

​

Client

​

Development

​

 

Foundation

 

Retaining Wall

 

Professional Services

​

:

​

:

​

:

​

:

 

​

:​

​

:

​

:

Makassar, South Sulawesi​

​

2011

​

PT. Planet Merah Empat

​

1 hotel tower (10 stories)

Basement (1 story)

​

Driven Pile (Push in / Jack in Method)

​

Sheetpile

 

Geotechnical consultancy

Soil investigation

Design of foundation and shoring system

ramada sakala.jpg

RAMADA SAKALA RESORT BALI

Location

​

Year

​

Client

​

Development

​

 

 

 

 

Foundation

​

Retaining Wall

​

Professional Services

​

:

​

:

​

:

​

:

 

​

 

 

 

:​

​

:

​

:

Tanjung Benoa, Bali​

​

2011

​

PT. Total Bangun Persada

​

Beach Front

Lobby (4 stories + 1 level basement)

Pool Villa

Garden Restaurant

Condotel (4 stories + 1 level basement)

​

Driven Pile 

​

Soldier Pile

 

Geotechnical consultancy

Design of foundation and shoring system

aston sentul.jpg

ASTON SENTUL RESORT & CONFERENCE CENTER

Location

​

Year

​

Client

​

Development

 

Foundation

​

Professional Services

​

:

​

:

​

:

​

:

​

:​

​

:

Sentul, Bogor, West Java​

​

2011

​

PT. Sentul Damai Resort

​

+/- 5 ha development area

​

Bored Pile

 

Geotechnical consultancy

Soil investigation

Design of foundation and slope stability analysis

tune hotel solo.jpg

TUNE HOTEL SOLO

Location

​

Year

​

Client

​

Development

 

 

Foundation

​

Professional Services

​

:

​

:

​

:

​

:

 

​

:​

​

:

Solo, Central Java​

​

2012

​

PT. Planet Merah Dua Belas

​

1 hotel tower (9 stories)

Basement (water tank + STP)

​

Driven Pile (Push in / Jack in Method)

 

Geotechnical consultancy

Soil investigation

Design of foundation and slope stability analysis

pullman bandung.jpg

PULLMAN CITY CENTER BANDUNG

Location

​

Year

​

Client

​

Development

 

​

​

Foundation

​

Retaining Wall

​

Professional Services

​

:

​

:

​

:

​

:

 

​

 

:​

​

:

​

:

Bandung, West Java​

​

2012

​

PT. Tritunggal Lestari Makmur

​

48.000m2 development area

1 hotel tower (13 stories)

Basement (2 stories)

​

Raft Foundation

​

Soldier Pile and Soil nailing

 

Geotechnical consultancy

Soil investigation

Design of foundation and shoring system

pulman vimala hills.jpg

​PULLMAN HOTEL @ VIMALA HILLS

Location

​

Year

​

Client

​

Development

 

Foundation

 

Retaining Wall

 

Professional Services

​

:

​

:

​

:

​

:

​

:​

​

:

​

:

Ciawi, Bogor, West Java​

​

2013

​

PT. Putra Adhi Prima

 

10 ha development area

​

Driven Pile

​

Soil Nailing and shotcrete

 

Geotechnical consultancy

Soil investigation

Design of foundation and shoring system

Inclinometer monitoring

Supervision for geotechnical works

holiday inn.jpg

HOLIDAY INN EXPRESS BARUNA

Location

​

Year

​

Client

​

Development

 

Foundation

 

Retaining Wall

 

Professional Services

​

:

​

:

​

:

​

:

​

:​

​

:

​

:

Baruna, Bali​

​

2013

​

PT. Menara Perdana

 

Hotel (5 stories)

​

Bored Pile and Raft Foundation

​

Secant Pile

 

Geotechnical consultancy

Design of foundation and shoring system

de pavilijoen.jpeg

DE PAVILIJOEN HOTEL

Location

​

Year

​

Client

​

Development

 

 

 

 

Foundation

 

Retaining Wall

 

Professional Services

​

:

​

:

​

:

​

:

​

 

 

 

:​

​

:

​

:

Bandung, West Java​

​

2014

​

PT. Perkasa Carista Estetika

 

1.550 m2 development area

Hotel tower (9 stories)

Podium (2 stories)

Basement (2 stories)

​

Shallow foundation

​

Soil nailing & secant pile

 

Geotechnical consultancy

Design of foundation and shoring system

Mason-Pine-Hotel-Bandung.jpg

MASON PINE HOTEL EXTENSION

Location

​

Year

​

Client

​

Development

 

​

Foundation

 

Retaining Wall

 

Professional Services

​

:

​

:

​

:

​

:

​

​

:​

​

:

​

:

Kota Baru Parahyangan, West Java​

​

2016

​

PT. Gistama Intisemesta

 

Hotel (7 stories)

Podium (3 stories)

​

Bored Pile

​

Soldier Pile

 

Geotechnical consultancy

Design of foundation and shoring system

santika.jpg

HOTEL SANTIKA

Location

​

Year

​

Client

​

Development

 

​

Foundation

 

Retaining Wall

 

Professional Services

​

​

​

Challenge and accomplishment

:

​

:

​

:

​

:

​

​

:​

​

:

​

:

​

​

​

​

:

Bukit Tinggi, West Sumatera​

​

2017

​

PT. Pesona Indonesia Mulia

 

Hotel (7 stories)

Basement (2 stories)

​

Bored Pile

​

Soldier Pile

 

Geotechnical consultancy

Soil investigation

Design of foundation and shoring system

Pile Testing with PDA Test

​

The design started in sloping ground with indication of moving ground. By protection using soldier piles for its basement excavation, GEC provides a system of stable foundation solution.

bottom of page